RegisterRegister
Log in to check your private messagesLog in to check your private messages
Log inLog in
FAQ  -  SEARCH  -  MEMBERS  -  FAVORITES  -  PROFILE
Bunker 2.0 build out
Goto page 1, 2, 3  Next
 
Post new topic   Reply to topic   printer-friendly view    Tape Op Message Board Forum Index -> Making A Space
View previous topic :: View next topic  
Author Message
JohnDavisNYC
ghost haunting audio students


Joined: 03 Oct 2003
Posts: 3019
Location: crooklyn, ny

PostPosted: Sun Jun 12, 2011 8:00 pm    Post subject: Bunker 2.0 build out Reply with quote

It's studio building season in Brooklyn.

I haven't made much noise here about The Bunker's new space, but we've finally started laying out the rooms, so now that some shit is ACTUALLY happening, I am gonna start posting regular updates.

Anyway, we found an insane space a few months ago... 3000 sq ft, with 2000 of them in a free standing factory with 30 ft vaulted ceilings and 1000 of them in the 16 ft tall first floor of a 5 story factory. We hired Rod Gervais to design it, as a build out and design on this level is way way way beyond our capability. Rod came up with an absolutely awesome design, based on our love of classic studios from the 70's, and what we have ended up with for the A room is sort of a hybrid between the A and C rooms at Avatar (Power Station). The B room is a smaller 2 room affair that will have a lot of the vibe of the current Bunker, but in the context of a proper build out.

The last month and a half has been devoted to working out the design, getting all the permits and teams in order, and cleaning out nearly 100 years of bad decisions, compromises, and cheapness from the space. Just so you know, 100 years of that equals about 70 cubic yards worth of dumpsters...

After a few days of final demolition, cleaning, and black lung, today our lead carpenter, Gary Everett, and I started laying out the studio, and today we did the B room, as a warm up...

Tomorrow the first shipment of lumber arrives, and we're going organize it all, get everything where we need it, and start cutting and laying the plates... then Tuesday A.M. the framing crew arrives and frames B while Gary and I lay out the bathrooms, lounge, and A.

Crazy. I never thought I would build in such a 'legit' manner... I'm used to just eyeballing where I think a booth should be, and then just doing it, without plans... this is a different world, but this space deserves to be done right!

John
_________________
i like to make music with music and stuff and things.

http://www.thebunkerstudio.com/
Back to top
View user's profile Send private message Visit poster's website
JohnDavisNYC
ghost haunting audio students


Joined: 03 Oct 2003
Posts: 3019
Location: crooklyn, ny

PostPosted: Sun Jun 12, 2011 8:05 pm    Post subject: Re: Bunker 2.0 build out Reply with quote

oh yeah... bookface is my update/photo platform of choice.

it's here:

http://www.facebook.com/media/set/?set=a.1989431209544.113995.1056261397&l=5d2eec4874

I hope that's public... not sure how to use the interwebs so good with the bookface.

john
_________________
i like to make music with music and stuff and things.

http://www.thebunkerstudio.com/
Back to top
View user's profile Send private message Visit poster's website
JohnDavisNYC
ghost haunting audio students


Joined: 03 Oct 2003
Posts: 3019
Location: crooklyn, ny

PostPosted: Mon Jun 13, 2011 8:18 pm    Post subject: Re: Bunker 2.0 build out Reply with quote

we carried so much god damn wood today. wow. ouch.

huge thanks to jacob, nico, jason, pat and matt for sharing the pain!

pics going up now.

john
_________________
i like to make music with music and stuff and things.

http://www.thebunkerstudio.com/
Back to top
View user's profile Send private message Visit poster's website
mjau
genitals didn't survive the freeze


Joined: 29 Sep 2003
Posts: 3918
Location: Ithaca, NY

PostPosted: Mon Jun 13, 2011 10:48 pm    Post subject: Re: Bunker 2.0 build out Reply with quote

JohnDavisNYC wrote:
we carried so much god damn wood today. wow. ouch.

Resisting the obligatory dick joke here.

Place looks great, man - loads of space. Those big windows will be nice.
_________________
~~~~~~~~
sounds
Back to top
View user's profile Send private message Visit poster's website
JohnDavisNYC
ghost haunting audio students


Joined: 03 Oct 2003
Posts: 3019
Location: crooklyn, ny

PostPosted: Tue Jun 14, 2011 9:57 pm    Post subject: Re: Bunker 2.0 build out Reply with quote

bathrooms are framed up, one b live room wall is framed and stood up, and the rest are laid out and ready to nail and stand up tomorrow!

forgot the camera at the space... pictures tomorrow!

john
_________________
i like to make music with music and stuff and things.

http://www.thebunkerstudio.com/
Back to top
View user's profile Send private message Visit poster's website
trodden
on a wing and a prayer


Joined: 07 May 2003
Posts: 5106
Location: C-attle

PostPosted: Tue Jun 14, 2011 10:38 pm    Post subject: Re: Bunker 2.0 build out Reply with quote

Hurray!!
_________________
http://www.facebook.com/pages/BlackQueen/189157907763139
http://www.myspace.com/suspiriorum
http://www.myspace.com/wormwood
http://www.facebook.com/brandon.fitzsimons


www.wormwood.us
Back to top
View user's profile Send private message Send e-mail Visit poster's website
JohnDavisNYC
ghost haunting audio students


Joined: 03 Oct 2003
Posts: 3019
Location: crooklyn, ny

PostPosted: Wed Jun 15, 2011 10:52 pm    Post subject: Re: Bunker 2.0 build out Reply with quote

here are some pictures from days 1 and 2 of framing. we're moving along nicely, i hope to have all of B framed up by the end of the week (including the ceilings, which are insane... 2x12's are a super party...)

http://www.facebook.com/media/set/?set=a.2012914956623.115299.1056261397&l=e477423bdd

john
_________________
i like to make music with music and stuff and things.

http://www.thebunkerstudio.com/
Back to top
View user's profile Send private message Visit poster's website
chris harris
speech impediment


Joined: 12 Aug 2003
Posts: 4123
Location: Norman, OK

PostPosted: Thu Jun 16, 2011 11:07 am    Post subject: Re: Bunker 2.0 build out Reply with quote

I'm really enjoying this! Thanks for posting!
_________________
Studio - http://www.hookechosound.com
Label - http://www.wearenicepeople.com
Band - http://www.depthandcurrent.com
Twitter - http://www.twitter.com/HoodEchoSound
Back to top
View user's profile Send private message Visit poster's website
JohnDavisNYC
ghost haunting audio students


Joined: 03 Oct 2003
Posts: 3019
Location: crooklyn, ny

PostPosted: Thu Jun 16, 2011 6:20 pm    Post subject: Re: Bunker 2.0 build out Reply with quote

we have finished framing the entire B live room, including the ceiling, and have to do the angled ceiling in the control room next, followed by the two side walls... front and back walls went up today.

been going really smoothly. we have a solid crew, and they are very precise without bogging down in details.... crucial.

i forgot my camera today, so tomorrow i'll update with pictures of the completely framed B room.

over the weekend i'm going to frame out the hallway, and then next week we start laying out and framing A!!!

john
_________________
i like to make music with music and stuff and things.

http://www.thebunkerstudio.com/
Back to top
View user's profile Send private message Visit poster's website
ררררררר
resurrected


Joined: 22 May 2006
Posts: 2389
Location: Brooklyn, NY

PostPosted: Thu Jun 16, 2011 11:18 pm    Post subject: Re: Bunker 2.0 build out Reply with quote

glad to see this coming along, John. I'd like to stop by sometime and see what's happening! Excited for you. If you need any help with anything, just call.
Back to top
View user's profile Send private message
thebunker
alignin' 24-trk


Joined: 30 Jul 2006
Posts: 55
Location: Brooklyn, NYC

PostPosted: Sat Jun 18, 2011 10:01 am    Post subject: Re: Bunker 2.0 build out Reply with quote

it's amazing to see this finally happening!

john and gary and crew have been working their asses off and the framing is just beautiful. rod's designs and engineering knowledge means that everything is being built super solidly.

rod figured out a way to get the ceiling in the A room up to 21ft which is going to be insane.

can't wait to get out of the studio next week and start helping with the build...
_________________
Aaron Nevezie
www.thebunkerstudio.com
www.nevezie.com
Back to top
View user's profile Send private message Visit poster's website
JohnDavisNYC
ghost haunting audio students


Joined: 03 Oct 2003
Posts: 3019
Location: crooklyn, ny

PostPosted: Sat Jun 18, 2011 6:03 pm    Post subject: Re: Bunker 2.0 build out Reply with quote

i just added new photos of B...

http://www.facebook.com/media/set/?set=a.1989431209544.113995.1056261397&l=5d2eec4874
_________________
i like to make music with music and stuff and things.

http://www.thebunkerstudio.com/
Back to top
View user's profile Send private message Visit poster's website
JohnDavisNYC
ghost haunting audio students


Joined: 03 Oct 2003
Posts: 3019
Location: crooklyn, ny

PostPosted: Tue Jun 21, 2011 9:17 am    Post subject: Re: Bunker 2.0 build out Reply with quote

walk through video from yesterday morning...

http://www.youtube.com/watch?v=dAN7keUt2T4&feature=youtu.be

john
_________________
i like to make music with music and stuff and things.

http://www.thebunkerstudio.com/
Back to top
View user's profile Send private message Visit poster's website
trodden
on a wing and a prayer


Joined: 07 May 2003
Posts: 5106
Location: C-attle

PostPosted: Wed Jun 22, 2011 7:37 pm    Post subject: Re: Bunker 2.0 build out Reply with quote

Jesus...

You guys (John, Joel, Marc) are blowing my freakin' mind.. first off how you can afford to do this in such an expensive city..

but more than anything, THE AMOUNT OF WORK YOU'VE DONE IN A WEEK IS MORE THAN I GOT DONE IN 3 MONTHS!!!

Fuck, all I had to do was build a bathroom/shower, kitchenette, an iso booth and room treatment!! and that on top of aesthetic work took me about 4-5 months!


now if i could only figure out how Joel's floors work... can 't seem to wrap my head around it.

nice job.. .nice freakin job!
_________________
http://www.facebook.com/pages/BlackQueen/189157907763139
http://www.myspace.com/suspiriorum
http://www.myspace.com/wormwood
http://www.facebook.com/brandon.fitzsimons


www.wormwood.us
Back to top
View user's profile Send private message Send e-mail Visit poster's website
JohnDavisNYC
ghost haunting audio students


Joined: 03 Oct 2003
Posts: 3019
Location: crooklyn, ny

PostPosted: Wed Jun 22, 2011 9:33 pm    Post subject: Re: Bunker 2.0 build out Reply with quote

thanks man! it's been crazy... we've been working super hard trying to frame as fast as possible without sacrificing the quality of the work. we're super lucky to have some great carpenters helping us out, and everyone involved is working efficiently as a team.

hoping to have the A control room up in the next 2 days... we'll see how that goes. and possible get a few walls of the string room up, or at the very least get all the studs cut so when we have to full team (tomorrow is just me, aaron, and jacob) we can get the walls stood up and braced.

it's really insane to be doing this... for the last 10 years we've just been working in whatever space, and then modifying our current space from loft into studio, and making it work... but building from scratch feels crazy. i never thought i'd build a proper studio from the ground up. and a big part of affording that is why we're moving so fast. we have to!

john
_________________
i like to make music with music and stuff and things.

http://www.thebunkerstudio.com/
Back to top
View user's profile Send private message Visit poster's website
Display posts from previous:   
Post new topic   Reply to topic   printer-friendly view    Tape Op Message Board Forum Index -> Making A Space All times are GMT - 4 Hours
Goto page 1, 2, 3  Next
Page 1 of 3

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum