filing in an inspection pit

Recording Techniques, People Skills, Gear, Recording Spaces, Computers, and DIY

Moderators: drumsound, tomb

User avatar
joninc
dead but not forgotten
Posts: 2100
Joined: Mon Jun 09, 2003 5:02 pm
Location: canada
Contact:

Post by joninc » Fri Nov 29, 2013 1:01 am

hot tub?
the new rules : there are no rules

User avatar
Nick Sevilla
on a wing and a prayer
Posts: 5572
Joined: Mon Mar 03, 2008 1:34 pm
Location: Lake Arrowhead California USA
Contact:

Post by Nick Sevilla » Fri Nov 29, 2013 6:49 am

Musician Motivational Pit?

Filled with water and piranhas, to ensure recording quality of all your projects.

(^^^)

<(((">
Howling at the neighbors. Hoping they have more mic cables.

User avatar
jhbrandt
alignin' 24-trk
Posts: 65
Joined: Wed Oct 06, 2010 5:39 pm
Location: Bekasi, Indonesia
Contact:

Post by jhbrandt » Fri Dec 06, 2013 1:22 am

goose134 wrote:Crushed rock with a slab poured over it should do the trick. If the rest of the floor is concrete, make sure you dowel the opening around the inspection pit to the new slab. You can drill holes for bits of rebar into the sides of the opening and tether the new pad's rebar to it.
I have to agree that it's too bad that the pit can't be made into something more useful. Worst control room ever? Inconvenient mic locker? I'm sure we could all think of something.
+1
All jokes aside, that's probably best for your situation.

Cheers,
John
John H. Brandt - Recording Studio, Performance Hall & Architectural Acoustics Consultants
http://www.jhbrandt.net

"Twenty thousand dollars worth of Snap-On tools does not make you a Professional Diesel Mechanic"

User avatar
Snarl 12/8
cryogenically thawing
Posts: 3511
Joined: Sat Dec 20, 2008 5:01 pm
Location: Right Cheer
Contact:

Post by Snarl 12/8 » Fri Dec 06, 2013 2:07 am

What about going the opposite way from what the Goose said and make a section of floor that's decoupled from the rest? It would be a good place to put kick drums and amps and not have them rumble other gear and mics.
Carl Keil

Almost forgot: Please steal my drum tracks. and more.

User avatar
goose134
pushin' record
Posts: 230
Joined: Sun Mar 22, 2009 7:45 pm

Post by goose134 » Sun Dec 15, 2013 10:06 pm

I'm intrigued by this ^^. Let's say you fill the recess as I have described but left some sort of "floating level between the crushed rock and the new pad. I suspect that the pad would have to at least double in thickness, but you could have a flexible border between the new pad and the old floor.

There is sure to be a difference in settling between the pads. I'd totally recommend getting a really good concrete guy involved.

I will say this: For very large buildings, there are expansion joints that allow the movement of settling, swaying and such. This idea would not be without precedent.
I make a living as an electrician, not recording in the basement.

Post Reply

Who is online

Users browsing this forum: No registered users and 61 guests